HIGH RISE HYDRANT REDESIGN
- 44-storey building, built in the early 1990s to Ord.70 standards.
- Full redesign of the system to the AS2005-2419 standard.
- 880m of new hydrant piping installed into the fire-isolated stairwell.
- New hydrant and pressure reduction zones.
- Modification to storage tanks to comply.
RECYCLING CENTRE SPRINKLER AND FIRE DETECTION DESIGN
- Large-scale industrial recycling centre.
- High hazard sprinkler design in accordance with AS2118.1- 2017.
- Design done in accordance with NSW Fire & Rescue Guidelines for Waste Management Facilities.
EC FAN WALL
- Modernisation of AHU fan system to new EC Fan wall for improved airflow and reduced energy consumption.